Cargo City: a terminal that ran past its capacity
BUD Cargo City opened in 2020 with about 21,600 m² of warehouse space, 11,000 m² of offices and 32,000 m² of handling space, according to the Polish Centre for Eastern Studies (OSW), and it can serve two wide-body aircraft at once. Capacity was raised to 420,000 tonnes in 2024; Budapest Airport then reported 426,519 tonnes for 2025, a record 42.3 % above 2024. The Hungarian state regained an 80 % stake in the airport in 2024.
A terminal working at its limit depends on equipment moving constantly: tugs, dollies, pallet and container dollies, forklifts and roll cages. When a dolly is not where the shift lead expects, the cost is minutes on every flight. Tag the equipment, post its position as rows, and a data link draws each item as a marker on the apron plan, with the zone it is in and how long since it last reported; real-time indoor asset tracking explains the pattern. Spatial Map does not connect to airport, airline or handler systems.