The Port of Baku, and what a yard needs
The new Port of Baku lies about 70 km from the capital and is part of the Trans-Caspian International Transport Route. According to the port’s own published figures, the first construction stage was completed in 2018, taking capacity to 15 million tons and 100,000 TEU, with a second stage planned for 25 million tons and 500,000 TEU. It lists 13 berths, a ferry terminal, a Ro-Ro terminal for up to 60,000 wheeled vehicles a year and general-cargo handling. These figures are the port’s and we have not verified them independently.
A port is a set of yards and sheds, and each yard has the same questions: which box is in which slot, which truck is waiting at which gate, which vehicle is on which deck. Spatial Map does not connect to the port’s systems; it maps your own yard, warehouse or depot and shows your reads on it. The Eastport demo shows yard slots, gate lanes, weighbridges and yard tractors, and Baku asset tracking covers the yard assets.










