The port yard: trailers, tractors and vehicles on decks
The Port of Baku sits about 70 km from the capital at Alat. By the port’s own published figures, the first construction stage was completed in 2018 with capacity of 15 million tons and 100,000 TEU, a ferry terminal, a Ro-Ro terminal with room for 60,000 wheeled vehicles a year and 13 berths in total; a second stage is planned. These are the port’s numbers and we have not verified them independently.
Around any terminal, the assets that cost most when lost are the movable ones: yard tractors, trailers, chassis, reach stackers, forklifts and spare containers. Tag them, give each a home area, and the map shows last-seen locations and a style rule colours the ones that have been away too long. In the Eastport demo yard tractors and trailers move through slots, gate lanes and weighbridges on one plan. Spatial Map does not connect to the port’s own systems, and it positions only what your tags and your engine report.









