Ljubljana · Zalog yard, Logatec, Brnik airport and the line from Koper

Warehouse tracking in Ljubljana, from the Zalog yard to the Logatec park

Spatial Map shows a warehouse on a live 3D map: racks coloured by stock, dock doors with their trucks, forklifts and pallets as markers, fed by the WMS, readers and sensors you already run. Warehouse tracking in Ljubljana covers sheds that sit on a rail and road crossroads: the Zalog marshalling yard on the city’s east side, parks towards Logatec and Vrhnika in the south-west and airport-side sheds at Brnik in the north. A company with several buildings keeps each as its own facility in one workspace.

No credit card. Runs in the browser. Pro is $60/month for up to 4 facilities. Book a demo

Crestline Fulfillment Center, a fulfillment center demo, in the Spatial Map 3D viewer with live device markers
Crestline Fulfillment Center
Crestline Fulfillment Center, a demo warehouse: 20 racks with 2,204 locations, staging lanes and the trailer yard.
Rack locations in the Crestline demo warehouse
2,204
Dock doors in the Eastport cross-dock demo
50
Interface languages for Ljubljana teams (Slovenian not yet available)
EN · DE
Free trial, up to 5 facilities, no card
7 days

Zalog: a marshalling yard and a logistics centre on one side of town

Zalog is where Ljubljana’s freight trains are made up and broken down. A project page from a Slovenian systems supplier describes the Zalog marshalling yard as one of the biggest in south-east Europe, upgraded after more than 30 years in service. The City of Ljubljana records the opening of a new logistics centre at Zalog on 5 June 2024, and says it strengthens the capital’s place in the European corridor network.

A building next to a marshalling yard lives by train arrivals: wagons come in, goods are transferred to a dock door and re-packed for onward trucks. Name each staging lane after a train or a customer, post each arrival and departure to a table, and the map shows what is staged, what is late and what has left. RFID warehouse management shows how portals at doors make the reads automatic, and the Eastport demo shows 50 dock doors and 1,180 RFID pallets in one building.

When the line is slow, the warehouse fills up

The Port of Koper’s own 2025 results note that works on the rail network in Slovenia and the wider region had a significant impact on operations, and rail carried 51 % of the port’s cargo. On 11 March 2026 a first test train ran on the new 27 km Divača–Koper line. Whatever the timetable, an operator in Ljubljana sees inbound volumes arrive in bursts, and the warehouse must absorb them.

A burst shows up first as full lanes and a shortage of space. A count rule on the lanes table, with a threshold per lane, raises an in-app alert when one is nearly full, and Show on map takes the supervisor to it. Spatial Map does not connect to rail, port or customs systems; it shows what your own WMS and readers say.

Logatec, Vrhnika and the south-western parks

South-west of the capital, along the motorway towards the coast, sit the parks where space is built. A property adviser’s figures record a 26,000 sqm speculative distribution warehouse completed at Logatec in the second quarter of 2025, and say logistics investment is spreading to Sežana, Maribor and Kranj.

Buildings built ahead of tenants are often leased by several companies, or by one company running a client’s stock. A solution per client groups the facilities, reports and tables, and read-only share links, limited to chosen layers and floors and with an expiry date, give each client a view of its own area: see group a site into a solution. The Crestline demo shows what a large building looks like, with racks coloured by stock status.

Brnik: airport-side sheds

Ljubljana Airport, at Brnik, served 1,591,443 passengers in 2025, up 10.6 %. A property adviser’s first-quarter 2026 figures list a planned distribution warehouse of about 15,000 sqm at Brnik, so the airport side of the market is still being built out.

Forwarders and consolidators at an airport work to flight and delivery cut-offs. Draw the dock doors and staging lanes, give each lane a flight or route code, and a table of pallets with their lane and status colours the floor; the supervisor sees whether everything that must leave tonight has reached the right door. Spatial Map has no link to airport or airline systems.

Services for teams in Ljubljana

Ljubljana teams usually start where the volume and the cut-offs are:

  • Warehouse operators begin with inventory tracking at rack level from the WMS, then RFID stock counting for cycle counts.
  • Forwarders near Zalog and Brnik begin with dock doors, lanes and the yard, then add asset tracking for forklifts, roll cages and trailers.
  • RTLS and UWB is for large sites where vehicles and people must be located continuously; a BlueIOT server connects directly and other engines through the write API.
  • If you have no readers or tags yet, our team can source them on request, quoted per project, with warranty and support from the manufacturer: see hardware and demo kits.
  • Handheld apps, WMS integrations and custom software are built as client projects, and the product runs as cloud or on-premises.

Also served nearby

The same page covers Domžale, Vrhnika, Kranj and Logatec around the capital, and Koper and Maribor further out. The app has no Slovenian interface; room names, rack codes and report titles in Slovenian display exactly as typed.

How Spatial Map does it

From a warehouse plan to a live map

  1. 01

    Map one building

    Upload the layout as PDF, DWG (R2004–R2018, placed as a picture) or image, align it at scale, and let AI Map draft racks, doors and areas for a person to review.

  2. 02

    Name doors, lanes and racks

    Use the codes your WMS uses, including train or flight codes for lanes.

  3. 03

    Connect stock and reads

    CSV or Excel exports, a polled REST endpoint, or the table write API for bulk upserts from your WMS and RFID middleware.

  4. 04

    Add lane and silence rules

    In-app alerts for lanes nearly full, pallets waiting too long and readers that stopped reporting; reports to PDF or Excel.

What Ljubljana teams track

Rail-fed warehouses at Zalog

Staging lanes by train, with arrivals, departures and lane counts.

Distribution parks towards Logatec

Rack-level stock, pick zones and staging lanes, with a view per client.

Airport-side forwarding at Brnik

Staging lanes by flight or route cut-off, with an in-app alert for a short lane.

Temperature-sensitive stock

Cold rooms and probes coloured on the plan, with in-app alerts for excursions.

See it on real demo facilities

Fictional names, real floor plans, live sensors, RFID, BLE tags and gateways — open any of them in the browser.

All 13 demo facilities

Warehouse tracking in Ljubljana — questions we get

Not yet. The app is available in English, German, French, Spanish, Arabic and Chinese, and each user picks their own language. Your own content — rack codes, room names, report titles — can be in Slovenian, with č, š and ž.

The map shows what your own data says. If your WMS or yard system posts a row per wagon or per train, with a lane and a status, those rows appear as markers or coloured lanes. Spatial Map does not read rail traffic or connect to railway systems.

Yes. Each building is a facility, and a workspace holds them together with shared members and roles. The Pro plan covers up to 4 facilities; larger estates are quoted as custom services.

Yes. The map is a drawing of the building you work in, made from its floor plan. It needs nothing from the landlord, and a facility can be copied and adjusted if you move between buildings.

No. Spatial Map is sold online and our team works with customers in Slovenia remotely, by video call and through the contact form, in English or German. There are no local resellers or partners.

No. Pricing is the same worldwide and in US dollars: a 7-day free trial for up to 5 facilities with no card, then Pro at $60 a month or $600 a year for up to 4 facilities. Readers and tags, if you ask us to source them, are quoted per project.

Map one Ljubljana warehouse before the next train.

Start the free trial and open the Crestline demo, or send us a warehouse layout and a CSV export of your stock through the contact form.