The canal, and the buildings around it
The Panama Canal Authority inaugurated the expanded canal on 26 June 2016, adding a third lane of locks: Agua Clara on the Atlantic side and Cocolí on the Pacific. The new Neopanamax locks take container ships of more than 14,000 TEU, and water-saving basins recycle about 60 % of the water used per transit. The canal is run by the authority, and Spatial Map has no part in vessel transits.
What it does is the work on land. Each ocean end has container terminals, a 76 km railway runs between the Pacific and Atlantic sides, and the cargo that stays for a while waits in yards and sheds. Spatial Map draws those dock doors, yard slots, gates and racks and colours them from your yard or WMS data, with RFID pallets shown where the last reader saw them, as in the Eastport Cross-Dock demo. Port and customs systems stay where they are.










